国产女人的高潮国语对白,日韩欧美人妻精品爽爽,亚洲韩国日本精品久久av,国产又粗又大的视频,亚洲国产精品嫩草影院在线观看,最新国产乱人伦偷精品免费网站

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

TECHNIC

SERVICES
国产女人的高潮国语对白,日韩欧美人妻精品爽爽,亚洲韩国日本精品久久av,国产又粗又大的视频,亚洲国产精品嫩草影院在线观看,最新国产乱人伦偷精品免费网站 亚洲欧美精品中文字幕在线播放| 亚洲精品一区二区三区| 日本三级手机在线观看| 亚洲视频中文字幕在线观看| 综合久久狠狠色99h中午| 中文一区二区三区无码视频| 综合欧美一区二区三区| 亚洲蜜臀AV乱码久久精品蜜桃| 一级特黄大片在线播放| 韩国三级年轻的小婊孑| 性A性欧美A色多| 亚洲aV无码成人动漫无遮挡| 中文毛片无遮挡高清免费| 伊人色综合久久天天人守人婷| 国产高清在线免费视频| 国产真实夫妇6p酒店交换| 国产αV无码专区亚洲αv| 一区二区三区久久久久久| 亚洲激情图片区图片| 97成人做爰A片免费看网站| 亚洲欧洲国产日产综合综合| 91香蕉国产线在线观看免费| 亚欧日韩毛片在线看免费网站| 欧美国产成人精品一区二区| 亚州国产欧美一区二区三区| 国产二区三区四区精品毛片| 国产精品成人无码久久久| 在线观看视频视频一区二区| 欧洲精品天堂一区二区无码视频| 久久秋霞精品中文字幕| 日产欧产精品精乱了派| 最新精品视频一区二区| 亚洲中文字幕第一页在线| 人妻人人澡人人爽人人精品乱| 精品久久久久久a片小说8| 国产一区视频在线观看| 内射人妻无套中出无码| 亚洲日本国产乱码va在线观看| 久久国产精品免费网站| 亚洲一级毛片AⅤ| av人摸人人人澡人人超碰小说| http://kxyinzhang.com http://woaiguangjie.com http://midcpl.com http://thhaideneng.com http://zyntcb.com http://xzhpjd.com